Managing Large-Area Stand Projects

Managing Large-Area Stand Projects

A large stand is not just an enlarged small stand. Team, materials, schedule and approval processes grow with multipliers; management becomes a design topic.

Clear responsibility and a single coordinator

If there are several suppliers, the distribution of responsibility should be written. A single coordinator prevents information loss between design, production and site teams.

Managing Large-Area Stand Projects

Staged approval and revision discipline

Concept, technical drawing and material approvals should be split into stages, with a revision limit for each. Changes after production are very expensive in a large project.

Site logistics and installation plan

In a large project, the unloading order of parts, crane and forklift needs, and the work schedule of different teams in the same area should be planned in advance.

Quick checklist

  • A single coordinator
  • Staged approval schedule
  • Unloading and installation order
  • Site equipment needs

Would you like ideas for your exhibition stand or space project? Get in touch with us; we will suggest a solution that fits your area and schedule.

Let's design your next stand together.

Tell us about your project and we will get back to you with the best-fitting solution.

+90 534 213 41 77
info@summermimarlik.com